Project Case Studies

Real Projects, Real Delivery

These cases demonstrate how we deliver complete material solutions for different project types across Melbourne. All data is based on actual project records.

Toorak Luxury Residence Renovation
Toorak, Melbourne 2024 380m²

Toorak Luxury Residence Renovation

Luxury Residential

Comprehensive material solution for a 1920s Federation-style home in Toorak, covering flooring, stone benchtops, bathroom hardware and lighting. The owner required preserving heritage character while integrating modern living comfort.

Challenge

Irregular dimensions and structural constraints of the heritage building required custom cutting for all materials. The owner demanded extremely high consistency in stone veining and colour tone, requiring hand-selection from multiple batches.

Our Solution

Used AI Material Assistant to quickly identify style direction, followed by on-site measurement by professional consultants and custom production from partner factories in Foshan. Stone benchtops used full-slab bookmatching for symmetrical veining, flooring selected 220mm wide European oak engineered boards to suit large-space proportions.

Products Used

Flooring

220mm European Oak Engineered Flooring

Stone & Benchtops

Calacatta Quartz Benchtop

Bathroom & Hardware

Matte Black Thermostatic Shower Set

Lighting

Magnetic Track Lighting System

Results

  • Material delivery in 6 weeks (including shipping + customs)
  • 100% satisfaction on stone veining matching
  • ~35% overall budget saving vs local retail procurement

South Yarra Boutique Apartments
South Yarra, Melbourne 2024 2,400m² (12 套)

South Yarra Boutique Apartments

Multi-storey Apartment Development

Bulk material procurement for a 12-unit boutique apartment development in South Yarra, including SPC flooring, wall panels, interior doors and bathroom packages. The developer required unified quality standards with staged delivery matching construction schedule.

Challenge

12 apartments needed perfectly consistent material quality while allowing 3 colour scheme variations across unit types. Construction in 3 stages required staged delivery with zero colour variation between batches.

Our Solution

Coordinated with Foshan factory to produce all 12 units' requirements from the same raw material batch, shipped in 3 stages matching construction progress. Sample confirmation before each shipment ensured batch consistency. Wall panels used quick-install clip system reducing on-site installation time by 40%.

Products Used

Flooring

6mm SPC Flooring (Oak Pattern)

Wall Panels

Bamboo-Wood Fibre Integrated Wall Panel

Doors & Windows

Narrow-Frame Interior Swing Door

Bathroom & Hardware

Undermount Basin + Faucet Package

Results

  • All materials for 12 apartments delivered within 8 weeks
  • Batch colour variance controlled within ΔE<1.5
  • ~40% per-unit material cost reduction vs local procurement

Richmond Commercial Space Fitout
Richmond, Melbourne 2025 650m²

Richmond Commercial Space Fitout

Commercial Office

Complete material solution for a creative office space in Richmond, including slatted wall panels, magnetic track lighting, custom storage joinery and acoustic flooring. The designer required a balance between industrial aesthetic and warm timber tones.

Challenge

Open-plan office needed to balance acoustic control with visual openness. Magnetic track lighting required perfect integration with ceiling structure, with fixtures needing flexible repositioning as workstations change.

Our Solution

Selected SPC flooring with acoustic underlay to reduce footfall transmission. Walls used PET acoustic slatted panels combining decoration with noise reduction. Magnetic track lighting custom-cut to ceiling joist spacing for seamless integration. Custom storage joinery used modular design for flexible reconfiguration as teams grow.

Products Used

Flooring

Acoustic SPC Flooring (Cement Grey)

Wall Panels

PET Acoustic Slatted Wall Panel

Lighting

Recessed Magnetic Track Light

Furniture & Joinery

Modular Custom Storage System

Results

  • Indoor noise reduced by ~12dB (NRC 0.65)
  • 50% faster lighting installation (tool-free magnetic)
  • ~30% total material + logistics saving vs local solution